Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Industrial and commercial machinery and equipment, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OK0083 #08 Y:1982 Utilize higher efficiency lamps and/or ballasts $469 $127
OK0083 #07 Y:1982 Use proper thickness of insulation on building envelope $16,433 $34,221
OK0083 #06 Y:1982 Enhance sensitivity of temperature control and cutoff $454 $130
OK0083 #05 Y:1982 Recover heat from exhausted steam, hot air or hot water $323 $730
OK0083 #04 Y:1982 Use separate switches on perimeter lighting which may be turned off when natural light is available $1,097 $200
OK0083 #03 Y:1982 Install timers and/or thermostats $3,118 $1,600
OK0083 #02 Y:1982 Install timers and/or thermostats $26,153 $3,160
OK0083 #01 Y:1982 Minimize use of outside make-up air for ventilation except when used for economizer cycle $2,427 $3,265
UD0061 #04 Y:1982 Use properly designed and sized hvac equipment $177 $500
UD0061 #03 Y:1982 Recover waste heat from equipment $820 $270
UD0061 #02 Y:1982 Reduce hot water temperature to the minimum required $72 -
UD0061 #01 Y:1982 Utilize higher efficiency lamps and/or ballasts $4,961 $9,877
UD0045 #03 Y:1982 Use proper thickness of insulation on building envelope $3,451 $3,100
UD0045 #02 Y:1982 Use computer programs to optimize hvac performance $4,586 $7,000
UD0045 #01 Y:1982 Install compressor air intakes in coolest locations $229 $400
UD0041 #05 Y:1982 Use proper thickness of insulation on building envelope $2,683 $5,588
UD0041 #04 Y:1982 Reduce hot water temperature to the minimum required $420 -
UD0041 #02 Y:1982 Reschedule plant operations or reduce load to avoid peaks $5,154 $500
UD0041 #01 Y:1982 Utilize higher efficiency lamps and/or ballasts $1,083 $590
OK0042 #05 Y:1982 Utilize higher efficiency lamps and/or ballasts $330 $1,250