Assessment Year | 1982 |
---|---|
Principal Product | CUSTOMIZED MACHINERY |
NAICS |
n/a
|
SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 216 |
Plant Area |
n/a
|
Annual Production | 0
units
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $71,676 | 1,431,125 |
kWh
|
$0.050 |
LPG | $20,669 | 2,707 |
MMBtu
|
$7.64 |
Fuel Oil #2 | $9,747 | 1,260 |
MMBtu
|
$7.74 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $9,340 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,503 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,083 | $590 |
$1,434
24,912
kWh
|
$(-351.0)
-
MMBtu
|
|
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $5,154 | $500 |
$5,154
-
kWh
|
- | |
04 | 2.6121: Reduce hot water temperature to the minimum required | $420 | - |
$420
8,499
kWh
|
- | |
05 | 2.7492: Use proper thickness of insulation on building envelope | $2,683 | $5,588 | - |
$2,683
-
MMBtu
|
|
TOTAL RECOMMENDED | $9,340 | $6,678 |
$7,008
33,411
kWh
|
$2,332
-
MMBtu
|
||
TOTAL IMPLEMENTED | $1,503 | $590 |
$1,854
33,411
kWh
|
$(-351.0)
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs