ITAC Assessment: UD0041
ITAC logo
ITAC Assessment: UD0041
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product CUSTOMIZED MACHINERY
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 216
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $71,676 1,431,125
kWh
LPG $20,669 2,707
MMBtu
Fuel Oil #2 $9,747 1,260
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,340 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,503

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,083 $590 $1,434
24,912
kWh
$(-351.0)
-
MMBtu
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $5,154 $500 $5,154
-
kWh
-
04 2.6121: Reduce hot water temperature to the minimum required $420 - $420
8,499
kWh
-
05 2.7492: Use proper thickness of insulation on building envelope $2,683 $5,588 - $2,683
-
MMBtu
TOTAL RECOMMENDED $9,340 $6,678 $7,008
33,411
kWh
$2,332
-
MMBtu
TOTAL IMPLEMENTED $1,503 $590 $1,854
33,411
kWh
$(-351.0)
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs