| Assessment Year | 1982 |
|---|---|
| Principal Product | CUSTOMIZED MACHINERY |
| NAICS |
n/a
|
| SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 216 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 4,000
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $71,676 | 1,431,125 |
kWh
|
$0.050 |
| LPG | $20,669 | 2,707 |
MMBtu
|
$7.64 |
| Fuel Oil #2 | $9,747 | 1,260 |
MMBtu
|
$7.74 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $9,340 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $1,503 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,083 | $590 |
$1,434
24,912
kWh
|
$(-351.0)
-
MMBtu
|
|
| 02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $5,154 | $500 |
$5,154
-
kWh
|
- | |
| 04 | 2.6121: Reduce hot water temperature to the minimum required | $420 | - |
$420
8,499
kWh
|
- | |
| 05 | 2.7492: Use proper thickness of insulation on building envelope | $2,683 | $5,588 | - |
$2,683
-
MMBtu
|
|
| TOTAL RECOMMENDED | $9,340 | $6,678 |
$7,008
33,411
kWh
|
$2,332
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $1,503 | $590 |
$1,854
33,411
kWh
|
$(-351.0)
-
MMBtu
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs