ITAC Assessment: SD0511
ITAC logo
ITAC Assessment: SD0511
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Aircraft components
NAICS 332112: Nonferrous Forging
SIC 3463: Nonferrous Forgings
Sales Range $10
M
to 50
M
# of Employees 45
Plant Area 80,000
ft2
Annual Production 100
pieces
Production Hrs. Annual 5,860
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $134,244 1,562,182
kWh
Electricity Demand $121,635 6,202
kW-mo/yr
Electricity Fees $8,865 -
Natural Gas $228,948 186,750
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,395 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $12,106 $21,000 - - - $12,106
-
MMBtu
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $9,418 $1,750 - - $9,418 -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,658 $2,000 $1,373
15,979
kWh
$1,285
-
kW-mo/yr
- -
04 2.4133: Use most efficient type of electric motors $2,296 $6,475 $1,118
13,012
kWh
$1,178
-
kW-mo/yr
- -
05 2.7135: Install occupancy sensors $2,105 $1,508 $2,105
24,500
kWh
- - -
06 2.2511: Insulate bare equipment $812 $2,323 - - - $812
-
MMBtu
TOTAL RECOMMENDED $29,395 $35,056 $4,596
53,491
kWh
$2,463
-
kW-mo/yr
$9,418 $12,918
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs