ITAC Assessment: LE0281
ITAC logo
ITAC Assessment: LE0281
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Transit related components
NAICS 333911: Pump and Pumping Equipment Manufacturing
SIC 3743: Railroad Equipment
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 101,000
ft2
Annual Production 100,000
lb
Production Hrs. Annual 3,120
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $104,855 924,200
kWh
Electricity Demand $28,773 2,720
kW-mo/yr
Natural Gas $30,130 2,130
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,676 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,841

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.7231: Use radiant heater for spot heating $9,502 $3,600 - - $9,502
-
MMBtu
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,477 $1,790 $5,497
48,648
kWh
$1,980
-
kW-mo/yr
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,659 $5,000 $4,161
36,823
kWh
$1,498
-
kW-mo/yr
- -
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,441 $2,500 - $1,441
-
kW-mo/yr
- -
05 2.2437: Recover waste heat from equipment $1,306 $1,000 - - $1,306
-
MMBtu
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $923 $240 $679
6,005
kWh
$244
-
kW-mo/yr
- -
07 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $831 $1,200 - - $831
-
MMBtu
-
08 2.4221: Install compressor air intakes in coolest locations $696 $800 $510
4,518
kWh
$186
-
kW-mo/yr
- -
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $670 $120 $492
4,357
kWh
$178
-
kW-mo/yr
- -
10 2.4314: Use synthetic lubricant $508 $500 $373
3,307
kWh
$135
-
kW-mo/yr
- -
11 2.7142: Utilize higher efficiency lamps and/or ballasts $13,106 $34,067 $9,575
84,735
kWh
$3,480
-
kW-mo/yr
- $51
12 2.7135: Install occupancy sensors $3,557 $780 $3,557
31,475
kWh
- - -
TOTAL RECOMMENDED $45,676 $51,597 $24,844
219,868
kWh
$9,142
-
kW-mo/yr
$11,639
-
MMBtu
$51
TOTAL IMPLEMENTED $9,841 $4,530 $6,176
54,653
kWh
$3,665
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs