Assessment Year | 1983 |
---|---|
Principal Product | STORAGE TANKS & FILTERS |
NAICS |
n/a
|
SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 250 |
Plant Area |
n/a
|
Annual Production | 2,000,000
lb
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $157,237 | 3,881,008 |
kWh
|
$0.041 |
Natural Gas | $62,068 | 20,714 |
MMBtu
|
$3.00 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $50,474 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $50,474 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle | $2,427 | $3,265 | - |
$2,427
-
MMBtu
|
|
02 | 2.7261: Install timers and/or thermostats | $26,153 | $3,160 | - |
$26,153
-
MMBtu
|
|
03 | 2.7261: Install timers and/or thermostats | $3,118 | $1,600 |
$3,118
107,562
kWh
|
- | |
04 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $1,097 | $200 |
$1,097
20,223
kWh
|
- | |
05 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $323 | $730 | - |
$323
-
MMBtu
|
|
06 | 2.2223: Enhance sensitivity of temperature control and cutoff | $454 | $130 | - |
$454
-
MMBtu
|
|
07 | 2.7492: Use proper thickness of insulation on building envelope | $16,433 | $34,221 | - |
$16,433
-
MMBtu
|
|
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $469 | $127 |
$469
16,120
kWh
|
- | |
TOTAL RECOMMENDED | $50,474 | $43,433 |
$4,684
143,905
kWh
|
$45,790
-
MMBtu
|
||
TOTAL IMPLEMENTED | $50,474 | $43,433 |
$4,684
143,905
kWh
|
$45,790
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs