ITAC Assessment: OK0083
ITAC logo
ITAC Assessment: OK0083
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product STORAGE TANKS & FILTERS
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 250
Plant Area
n/a
Annual Production 2,000,000
lb
Production Hrs. Annual 2,080
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $157,237 3,881,008
kWh
Natural Gas $62,068 20,714
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $50,474 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $50,474

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $2,427 $3,265 - $2,427
-
MMBtu
02 2.7261: Install timers and/or thermostats $26,153 $3,160 - $26,153
-
MMBtu
03 2.7261: Install timers and/or thermostats $3,118 $1,600 $3,118
107,562
kWh
-
04 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $1,097 $200 $1,097
20,223
kWh
-
05 2.2449: Recover heat from exhausted steam, hot air or hot water $323 $730 - $323
-
MMBtu
06 2.2223: Enhance sensitivity of temperature control and cutoff $454 $130 - $454
-
MMBtu
07 2.7492: Use proper thickness of insulation on building envelope $16,433 $34,221 - $16,433
-
MMBtu
08 2.7142: Utilize higher efficiency lamps and/or ballasts $469 $127 $469
16,120
kWh
-
TOTAL RECOMMENDED $50,474 $43,433 $4,684
143,905
kWh
$45,790
-
MMBtu
TOTAL IMPLEMENTED $50,474 $43,433 $4,684
143,905
kWh
$45,790
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs