ITAC Assessment: AS0270
ITAC logo
ITAC Assessment: AS0270
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product General Repairs, Production, Custom Fabrication
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 16
Plant Area 50,000
ft2
Annual Production 600
pieces
Production Hrs. Annual 2,625
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $21,892 252,931
kWh
Electricity Demand $1,082 732
kW-mo/yr
Electricity Fees $1,840 -
Natural Gas $6,176 789
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $276,989 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $273,112

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Primary Product Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,324 $6,008 $1,798
23,447
kWh
$526
-
kW-mo/yr
- -
02 2.7135: Install occupancy sensors $896 $300 $734
9,672
kWh
$162
-
kW-mo/yr
- -
03 2.7121: Utilize daylight whenever possible in lieu of artificial light $2,275 $1,890 $2,275
29,894
kWh
- - -
04 2.4224: Upgrade controls on compressors $1,608 $200 $1,215
15,826
kWh
$393
-
kW-mo/yr
- -
05 3.6192: Use a less expensive method of waste removal $516 $60 - - $516 -
06 3.6192: Use a less expensive method of waste removal $190 $95 - - $190 -
07 4.421: Modify current incentive program $269,180 $100,000 - - - $269,180
TOTAL RECOMMENDED $276,989 $108,553 $6,022
78,839
kWh
$1,081
-
kW-mo/yr
$706 $269,180
TOTAL IMPLEMENTED $273,112 $106,208 $3,013
39,273
kWh
$919
-
kW-mo/yr
- $269,180
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs