Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,609

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Sheet metal work
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MZ0022 #02 Y:2008 Install compressor air intakes in coolest locations $382 $900
MZ0022 #01 Y:2008 Re-size charging openings or add a movable door on equipment $1,425 $2,800
NC0377 #07 Y:2008 Utilize higher efficiency lamps and/or ballasts $1,691 $1,495
NC0377 #06 Y:2008 Utilize higher efficiency lamps and/or ballasts $26,040 $111,342
NC0377 #05 Y:2008 Eliminate leaks in inert gas and compressed air lines/ valves $595 $100
NC0377 #04 Y:2008 Recover waste heat from equipment $5,415 $11,000
NC0377 #03 Y:2008 Develop a repair/replace policy $475 $930
NC0377 #02 Y:2008 Reschedule plant operations or reduce load to avoid peaks $2,040 $1,000
NC0377 #01 Y:2008 Replace obsolete burners with more efficient ones $1,484 $2,800
GT0839 #05 Y:2007 Reduce the pressure of compressed air to the minimum required $6,582 -
GT0839 #04 Y:2007 Eliminate leaks in inert gas and compressed air lines/ valves $14,992 $1,000
GT0839 #03 Y:2007 Cool compressor air intake with heat exchanger $4,603 $5,050
GT0839 #02 Y:2007 Utilize higher efficiency lamps and/or ballasts $22,858 $49,525
GT0839 #01 Y:2007 Utilize higher efficiency lamps and/or ballasts $2,317 $5,346
TA0119 #05 Y:2006 Make a practice of turning off lights when not needed $60 -
TA0119 #04 Y:2006 Utilize higher efficiency lamps and/or ballasts $370 $370
TA0119 #03 Y:2006 Utilize higher efficiency lamps and/or ballasts $480 -
TA0119 #02 Y:2006 Eliminate leaks in inert gas and compressed air lines/ valves $1,785 $385
TA0119 #01 Y:2006 Optimize plant power factor $14,150 $25,000
IA0395 #05 Y:2006 Reduce the pressure of compressed air to the minimum required $4,463 $9,500