ITAC Assessment: TA0119
ITAC logo
ITAC Assessment: TA0119
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Ventilation and Air conditioning duct work
NAICS 332322: Sheet Metal Work Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $5
M
to 10
M
# of Employees 145
Plant Area 110,000
ft2
Annual Production 5,000,000
lb
Production Hrs. Annual 2,927
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $151,646 1,512,675
kWh
Electricity Demand $36,407 6,113
kW-mo/yr
Natural Gas $19,051 1,490
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,845 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,845

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.3212: Optimize plant power factor $14,150 $25,000 - - $14,150
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,785 $385 $1,465
15,579
kWh
$320
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $480 - $395
4,215
kWh
$85
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $370 $370 $345
3,679
kWh
$25
-
kW-mo/yr
-
05 2.7124: Make a practice of turning off lights when not needed $60 - $60
601
kWh
- -
TOTAL RECOMMENDED $16,845 $25,755 $2,265
24,074
kWh
$430
-
kW-mo/yr
$14,150
TOTAL IMPLEMENTED $16,845 $25,755 $2,265
24,074
kWh
$430
-
kW-mo/yr
$14,150
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs