ITAC Assessment: OK0618
ITAC logo
ITAC Assessment: OK0618
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Pre-cut Produce
NAICS
n/a
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 80
Plant Area 35,000
ft2
Annual Production 10,000,000
lb
Production Hrs. Annual 3,600
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $29,043 927,125
kWh
Electricity Demand $23,782 232
kW-mo/yr
Electricity Fees $8,834 -
Natural Gas $3,144 1,196
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,820 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,819

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,359 $4,547 $734
23,315
kWh
$506
-
kW-mo/yr
- - - $119
02 2.7135: Install occupancy sensors $542 $1,523 $542
17,585
kWh
- - - - -
03 2.6232: Install set-back timers $4,260 $385 - - $4,260
-
MMBtu
- - -
04 2.4224: Upgrade controls on compressors $459 $140 $459
14,920
kWh
- - - - -
05 4.513: Re-arrange equipment layout to reduce labor costs $28,000 - - - - - $28,000 -
06 3.1293: Separate treatments for each type of solution and recycle $4,200 - - - - $4,200
-
Tgal
- -
TOTAL RECOMMENDED $38,820 $6,595 $1,735
55,820
kWh
$506
-
kW-mo/yr
$4,260
-
MMBtu
$4,200
-
Tgal
$28,000 $119
TOTAL IMPLEMENTED $9,819 $4,932 $734
23,315
kWh
$506
-
kW-mo/yr
$4,260
-
MMBtu
$4,200
-
Tgal
- $119
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs