ITAC Assessment: IA0395
ITAC logo
ITAC Assessment: IA0395
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Tool Storage Units
NAICS 332439: Other Metal Container Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $50
M
to 100
M
# of Employees 355
Plant Area 500,000
ft2
Annual Production 25,000,000
lb
Production Hrs. Annual 4,000
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $584,895 16,207,100
kWh
Electricity Demand $149,089 33,060
kW-mo/yr
Electricity Fees $10,004 -
Natural Gas $1,050,841 108,408
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,659 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,196

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,347 $11,263 $1,683
57,260
kWh
$1,664
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $9,322 $27,832 $5,374
182,800
kWh
$3,948
-
kW-mo/yr
03 2.4133: Use most efficient type of electric motors $751 - $433
14,712
kWh
$318
-
kW-mo/yr
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,776 $672 $2,176
74,080
kWh
$1,600
-
kW-mo/yr
05 2.4231: Reduce the pressure of compressed air to the minimum required $4,463 $9,500 $2,573
87,520
kWh
$1,890
-
kW-mo/yr
TOTAL RECOMMENDED $21,659 $49,267 $12,239
416,372
kWh
$9,420
-
kW-mo/yr
TOTAL IMPLEMENTED $17,196 $39,767 $9,666
328,852
kWh
$7,530
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs