ITAC Assessment: SU0401
ITAC logo
ITAC Assessment: SU0401
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Heavy Gage Thermoplastic Parts
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 89
Plant Area 84,200
ft2
Annual Production 1,000
units
Production Hrs. Annual 4,160
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $78,595 1,233,009
kWh
Electricity Demand $68,890 5,875
kW-mo/yr
Electricity Fees $4,278 -
Natural Gas $84,871 14,913
MMBtu
LPG $5,611 182
MMBtu
Fuel Oil #2 $13,143 827
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,200 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,282

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 4.821: Pay bills on time to avoid late fees $2,820 - - - - - $2,820
02 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $3,274 $1,580 $3,274
51,396
kWh
- - - -
03 2.4221: Install compressor air intakes in coolest locations $964 $469 $964
15,130
kWh
- - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $383 $240 $234
3,679
kWh
$59
-
kW-mo/yr
- $57 $33
05 2.1224: Replace boiler $11,805 $10,686 - - - - $11,805
06 2.6211: Conserve energy by efficient use of vending machines $218 $404 $218
3,416
kWh
- - - -
07 3.1161: Eliminate/reduce an operation $956 $3,709 $(-402.0)
(-6,304)
kWh
$(-633.0)
-
kW-mo/yr
- $828 $1,163
08 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $9,780 $49,000 - - $9,780
-
MMBtu
- -
TOTAL RECOMMENDED $30,200 $66,088 $4,288
67,317
kWh
$(-574.0)
-
kW-mo/yr
$9,780
-
MMBtu
$885 $15,821
TOTAL IMPLEMENTED $18,282 $12,506 $3,508
55,075
kWh
$59
-
kW-mo/yr
- $57 $14,658
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs