Assessment Year | 2008 |
---|---|
Principal Product | Cabinets for switchgear |
NAICS | 332322: Sheet Metal Work Manufacturing |
SIC | 3444: Sheet Metal Work |
Sales Range | $10 M to 50M |
# of Employees | 290 |
Plant Area |
128,000
ft2
|
Annual Production | 3,000
pieces
|
Production Hrs. Annual | 4,500
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $183,042 | 5,248,043 |
kWh
|
$0.035 |
Electricity Demand | $45,964 | 11,910 |
kW-mo/yr
|
$3.86 |
Electricity Fees | $14,287 | - |
|
- |
Natural Gas | $238,696 | 24,124 |
MMBtu
|
$9.89 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $37,740 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $32,325 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.1221: Replace obsolete burners with more efficient ones | $1,484 | $2,800 | - | - |
$1,484
-
MMBtu
|
|
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,040 | $1,000 | - |
$2,040
-
kW-mo/yr
|
- | |
03 | 2.4151: Develop a repair/replace policy | $475 | $930 |
$302
8,616
kWh
|
$173
-
kW-mo/yr
|
- | |
04 | 2.2437: Recover waste heat from equipment | $5,415 | $11,000 | - | - |
$5,415
-
MMBtu
|
|
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $595 | $100 |
$392
11,190
kWh
|
$203
-
kW-mo/yr
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $26,040 | $111,342 |
$16,165
461,852
kWh
|
$9,875
-
kW-mo/yr
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,691 | $1,495 |
$914
26,112
kWh
|
$777
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $37,740 | $128,667 |
$17,773
507,770
kWh
|
$13,068
-
kW-mo/yr
|
$6,899
-
MMBtu
|
||
TOTAL IMPLEMENTED | $32,325 | $117,667 |
$17,773
507,770
kWh
|
$13,068
-
kW-mo/yr
|
$1,484
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |