ITAC Assessment: NC0377
ITAC logo
ITAC Assessment: NC0377
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Cabinets for switchgear
NAICS 332322: Sheet Metal Work Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 290
Plant Area 128,000
ft2
Annual Production 3,000
pieces
Production Hrs. Annual 4,500
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $183,042 5,248,043
kWh
Electricity Demand $45,964 11,910
kW-mo/yr
Electricity Fees $14,287 -
Natural Gas $238,696 24,124
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,740 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,325

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1221: Replace obsolete burners with more efficient ones $1,484 $2,800 - - $1,484
-
MMBtu
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,040 $1,000 - $2,040
-
kW-mo/yr
-
03 2.4151: Develop a repair/replace policy $475 $930 $302
8,616
kWh
$173
-
kW-mo/yr
-
04 2.2437: Recover waste heat from equipment $5,415 $11,000 - - $5,415
-
MMBtu
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $595 $100 $392
11,190
kWh
$203
-
kW-mo/yr
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $26,040 $111,342 $16,165
461,852
kWh
$9,875
-
kW-mo/yr
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,691 $1,495 $914
26,112
kWh
$777
-
kW-mo/yr
-
TOTAL RECOMMENDED $37,740 $128,667 $17,773
507,770
kWh
$13,068
-
kW-mo/yr
$6,899
-
MMBtu
TOTAL IMPLEMENTED $32,325 $117,667 $17,773
507,770
kWh
$13,068
-
kW-mo/yr
$1,484
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs