ITAC Assessment: CI0038
ITAC logo
ITAC Assessment: CI0038
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Beer/Malt Beverages
NAICS 312120: Breweries
SIC 2082: Malt Beverages
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area 23,328
ft2
Annual Production 5,000
bbl
Production Hrs. Annual 3,900
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $62,512 300,192
kWh
Electricity Demand $15,719 1,763
kW-mo/yr
Electricity Fees $7,362 -
Natural Gas $21,963 1,905
MMBtu
Waste Disposal Costs
Water Usage $13,226 1,747
Tgal
Water Disposal $1,265 1,747
Tgal
TOTAL YEARLY COSTS $122,047
RECOMMENDED SAVINGS* $118,974 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.9114: Use solar heat to make electricty $57,768 $242,254 $54,849
263,445
kWh
$2,919
-
kW-mo/yr
- - -
02 2.7447: Install vinyl strip / high speed / air curtain doors $28,800 $10,000 $28,800
138,330
kWh
- - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,400 $1,000 $8,304
39,886
kWh
$1,096
-
kW-mo/yr
- - -
04 2.2515: Use optimum thickness insulation $8,867 $17,866 $8,867
42,592
kWh
- - - -
05 2.7134: Use photocell controls $4,714 $1,500 $3,652
17,540
kWh
$902
-
kW-mo/yr
- $10 $150
06 2.1224: Replace boiler $3,607 $9,000 $(-4,547.0)
(-43,680)
kWh
$(-240.0)
-
kW-mo/yr
$8,394
-
MMBtu
- -
07 2.7135: Install occupancy sensors $2,690 $1,100 $2,377
11,419
kWh
$313
-
kW-mo/yr
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,786 $792 $1,578
7,581
kWh
$208
-
kW-mo/yr
- - -
09 2.1321: Replace fossil fuel equipment with electrical equipment $765 $3,000 - - $765
-
MMBtu
- -
10 2.3132: Recharge batteries on during off-peak demand periods $577 $150 - $577
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $118,974 $286,662 $103,880
477,113
kWh
$5,775
-
kW-mo/yr
$9,159
-
MMBtu
$10 $150
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs