Assessment Year | 2024 |
---|---|
Principal Product | Beer/Malt Beverages |
NAICS | 312120: Breweries |
SIC | 2082: Malt Beverages |
Sales Range | $1 M to 5M |
# of Employees | 30 |
Plant Area |
23,328
ft2
|
Annual Production | 5,000
bbl
|
Production Hrs. Annual | 3,900
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $62,512 | 300,192 |
kWh
|
$0.21 | |
Electricity Demand | $15,719 | 1,763 |
kW-mo/yr
|
$8.92 | |
Electricity Fees | $7,362 | - |
|
- | |
Natural Gas | $21,963 | 1,905 |
MMBtu
|
$11.53 | |
Waste Disposal Costs | |||||
Water Usage | $13,226 | 1,747 |
Tgal
|
$7.57 | |
Water Disposal | $1,265 | 1,747 |
Tgal
|
$0.72 | |
TOTAL YEARLY COSTS | $122,047 | ||||
RECOMMENDED SAVINGS* | $118,974 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $57,768 | $242,254 |
$54,849
263,445
kWh
|
$2,919
-
kW-mo/yr
|
- | - | - | |
02 | 2.7447: Install vinyl strip / high speed / air curtain doors | $28,800 | $10,000 |
$28,800
138,330
kWh
|
- | - | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,400 | $1,000 |
$8,304
39,886
kWh
|
$1,096
-
kW-mo/yr
|
- | - | - | |
04 | 2.2515: Use optimum thickness insulation | $8,867 | $17,866 |
$8,867
42,592
kWh
|
- | - | - | - | |
05 | 2.7134: Use photocell controls | $4,714 | $1,500 |
$3,652
17,540
kWh
|
$902
-
kW-mo/yr
|
- | $10 | $150 | |
06 | 2.1224: Replace boiler | $3,607 | $9,000 |
$(-4,547.0)
(-43,680)
kWh
|
$(-240.0)
-
kW-mo/yr
|
$8,394
-
MMBtu
|
- | - | |
07 | 2.7135: Install occupancy sensors | $2,690 | $1,100 |
$2,377
11,419
kWh
|
$313
-
kW-mo/yr
|
- | - | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,786 | $792 |
$1,578
7,581
kWh
|
$208
-
kW-mo/yr
|
- | - | - | |
09 | 2.1321: Replace fossil fuel equipment with electrical equipment | $765 | $3,000 | - | - |
$765
-
MMBtu
|
- | - | |
10 | 2.3132: Recharge batteries on during off-peak demand periods | $577 | $150 | - |
$577
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $118,974 | $286,662 |
$103,880
477,113
kWh
|
$5,775
-
kW-mo/yr
|
$9,159
-
MMBtu
|
$10 | $150 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs