ITAC Assessment: MZ0022
ITAC logo
ITAC Assessment: MZ0022
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Fabricated metal sheet products
NAICS 332322: Sheet Metal Work Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 92
Plant Area 100,000
ft2
Annual Production 300,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $135,397 2,315,100
kWh
Natural Gas $186,649 24,894
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $55,068 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $55,068

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1122: Re-size charging openings or add a movable door on equipment $1,425 $2,800 - $1,425
-
MMBtu
02 2.4221: Install compressor air intakes in coolest locations $382 $900 $382
7,764
kWh
-
03 2.2223: Enhance sensitivity of temperature control and cutoff $11,853 $5,458 - $11,853
-
MMBtu
04 3.1161: Eliminate/reduce an operation $41,408 - - $41,408
-
MMBtu
TOTAL RECOMMENDED $55,068 $9,158 $382
7,764
kWh
$54,686
-
MMBtu
TOTAL IMPLEMENTED $55,068 $9,158 $382
7,764
kWh
$54,686
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs