ITAC Assessment: GT0839
ITAC logo
ITAC Assessment: GT0839
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Sheet Metal Work
NAICS 332322: Sheet Metal Work Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 137
Plant Area 120,000
ft2
Annual Production 1,000
units
Production Hrs. Annual 4,160
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $132,086 3,083,394
kWh
Electricity Demand $54,373 7,618
kW-mo/yr
Electricity Fees $24,739 -
Natural Gas $326,822 25,591
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,352 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $46,749

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,317 $5,346 $1,191
32,350
kWh
$1,126
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $22,858 $49,525 $11,748
319,250
kWh
$11,110
-
kW-mo/yr
-
03 2.4234: Cool compressor air intake with heat exchanger $4,603 $5,050 $(-261.0)
(-4,408)
kWh
- $4,864
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $14,992 $1,000 $14,992
252,824
kWh
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $6,582 - $6,582
110,998
kWh
- -
TOTAL RECOMMENDED $51,352 $60,921 $34,252
711,014
kWh
$12,236
-
kW-mo/yr
$4,864
-
MMBtu
TOTAL IMPLEMENTED $46,749 $55,871 $34,513
715,422
kWh
$12,236
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs