ITAC Assessment: SF0504
ITAC logo
ITAC Assessment: SF0504
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product electronic medical devices
NAICS 334510: Electromedical and Electrotherapeutic Apparatus Manufacturing
SIC 3845: Electromedical and Electrotherapeutic Apparatus
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 65,000
ft2
Annual Production 5,000
units
Production Hrs. Annual 3,250
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $116,615 789,123
kWh
Electricity Demand $30,405 2,207
kW-mo/yr
Natural Gas $42,469 4,222
MMBtu
TOTAL YEARLY COSTS $189,489
RECOMMENDED SAVINGS* $83,375 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,768

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,032 $100 $769
5,217
kWh
$263
-
kW-mo/yr
02 2.7111: Reduce illumination to minimum necessary levels $6,259 $2,279 $4,699
31,870
kWh
$1,560
-
kW-mo/yr
03 2.7135: Install occupancy sensors $1,736 $7,335 $1,231
8,351
kWh
$505
-
kW-mo/yr
04 2.9114: Use solar heat to make electricty $74,348 $373,319 $58,731
398,362
kWh
$15,617
-
kW-mo/yr
TOTAL RECOMMENDED $83,375 $383,033 $65,430
443,800
kWh
$17,945
-
kW-mo/yr
TOTAL IMPLEMENTED $2,768 $7,435 $2,000
13,568
kWh
$768
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs