Assessment Year | 2024 |
---|---|
Principal Product | Prototype medical device parts, inserter tools and implants. |
NAICS | 339112: Surgical and Medical Instrument Manufacturing |
SIC | 3841: Surgical and Medical Instruments and Apparatus |
Sales Range | $1 M to 5M |
# of Employees | 35 |
Plant Area |
30,000
ft2
|
Annual Production | 350,000
pieces
|
Production Hrs. Annual | 5,928
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $68,677 | 586,080 |
kWh
|
$0.12 | |
Electricity Demand | $23,763 | 1,897 |
kW-mo/yr
|
$12.53 | |
Electricity Fees | $6,489 | - |
|
- | |
Natural Gas | $5,489 | 747 |
MMBtu
|
$7.35 | |
Waste Disposal Costs | |||||
Water Usage | $2,893 | 18,519 |
Tgal
|
$0.16 | |
TOTAL YEARLY COSTS | $107,310 | ||||
RECOMMENDED SAVINGS* | $21,335 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2211: Use optimum temperature | $370 | - | - | - | - |
$370
-
MMBtu
|
|
02 | 2.4221: Install compressor air intakes in coolest locations | $769 | $1,119 |
$673
5,608
kWh
|
$97
-
kW-mo/yr
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $286 | $114 |
$250
2,080
kWh
|
$36
-
kW-mo/yr
|
- | - | |
04 | 2.7111: Reduce illumination to minimum necessary levels | $782 | $300 |
$644
5,368
kWh
|
$138
-
kW-mo/yr
|
- | - | |
05 | 2.7124: Make a practice of turning off lights when not needed | $595 | - |
$509
4,245
kWh
|
$85
-
kW-mo/yr
|
- | - | |
06 | 2.7134: Use photocell controls | $601 | $346 |
$526
4,380
kWh
|
$75
-
kW-mo/yr
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,335 | $1,202 |
$2,010
16,754
kWh
|
$325
-
kW-mo/yr
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $106 | $172 |
$93
771
kWh
|
$14
-
kW-mo/yr
|
- | - | |
09 | 2.7447: Install vinyl strip / high speed / air curtain doors | $3,795 | $3,745 |
$(-45.6)
(-380)
kWh
|
$(-238.2)
-
kW-mo/yr
|
- |
$4,079
-
MMBtu
|
|
10 | 2.8121: Apply for tax-free status for energy purchases | $11,697 | - | - | - | $11,697 | - | |
TOTAL RECOMMENDED | $21,335 | $6,998 |
$4,659
38,826
kWh
|
$531
-
kW-mo/yr
|
$11,697 |
$4,449
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs