Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

279

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Gypsum products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WV0603 #04 Y:2020 Insulate bare equipment $10,297 $13,192
WV0603 #03 Y:2020 Develop a repair/replace policy $11,834 $1,018
WV0603 #02 Y:2020 Use adjustable frequency drive or multiple speed motors on existing system $153,514 $84,253
WV0603 #01 Y:2020 Analyze flue gas for proper air/fuel ratio $335,278 $8,838
AS0459 #05 Y:2018 Turn off equipment when not in use $881 $350
AS0459 #04 Y:2018 Install timers and/or thermostats $1,642 $3,200
AS0459 #03 Y:2018 Replace existing hvac unit with high efficiency model $3,682 $13,900
AS0459 #02 Y:2018 Eliminate leaks in inert gas and compressed air lines/ valves $8,314 $280
AS0459 #01 Y:2018 Use most efficient type of electric motors $23,170 $22,956
GT0898 #05 Y:2017 Use solar heat for heat $42,901 $150,153
GT0898 #04 Y:2017 Use adjustable frequency drive or multiple speed motors on existing system $4,223 $8,011
GT0898 #03 Y:2017 Utilize higher efficiency lamps and/or ballasts $8,648 $9,390
GT0898 #02 Y:2017 Meter waste water $38,607 $18,000
GT0898 #01 Y:2017 Eliminate leaks in inert gas and compressed air lines/ valves $1,203 $150
UM0433 #04 Y:2013 Recover waste heat from equipment $37,193 $1,000
UM0433 #03 Y:2013 Reschedule plant operations or reduce load to avoid peaks $22,580 $1,000
UM0433 #02 Y:2013 Substitute compressed air cooling with water or air cooling $19,439 $2,500
UM0433 #01 Y:2013 Utilize higher efficiency lamps and/or ballasts $23,008 $21,730
OR0597 #04 Y:2012 Install occupancy sensors $3,853 $3,853
OR0597 #03 Y:2012 Utilize energy-efficient belts and other improved mechanisms $11,892 $11,892