ITAC Assessment: UM0433
ITAC logo
ITAC Assessment: UM0433
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Gypsum Product Manufacturing
NAICS 327420: Gypsum Product Manufacturing
SIC 3275: Gypsum Products
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 50,000
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $134,318 2,441,760
kWh
Electricity Demand $108,386 16,095
kW-mo/yr
Natural Gas $150,841 17,203
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $102,220 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $56,632

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $23,008 $21,730 $19,535
341,530
kWh
$3,473
-
kW-mo/yr
-
02 2.4237: Substitute compressed air cooling with water or air cooling $19,439 $2,500 $19,439
339,840
kWh
- -
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $22,580 $1,000 - $22,580
-
kW-mo/yr
-
04 2.2437: Recover waste heat from equipment $37,193 $1,000 - - $37,193
-
MMBtu
TOTAL RECOMMENDED $102,220 $26,230 $38,974
681,370
kWh
$26,053
-
kW-mo/yr
$37,193
-
MMBtu
TOTAL IMPLEMENTED $56,632 $3,500 $19,439
339,840
kWh
- $37,193
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs