Assessment Year | 2018 |
---|---|
Principal Product | Gypsum Products |
NAICS | 327420: Gypsum Product Manufacturing |
SIC | 3275: Gypsum Products |
Sales Range | $10 M to 50M |
# of Employees | 20 |
Plant Area |
87,000
ft2
|
Annual Production | 60,000
ton
|
Production Hrs. Annual | 5,754
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $131,921 | 1,624,000 |
kWh
|
$0.081 | |
Electricity Demand | $22,413 | 4,440 |
kW-mo/yr
|
$5.05 | |
Electricity Fees | $9,454 | - |
|
- | |
Fuel Oil #1 | $10,409 | 867 |
MMBtu
|
$12.01 | |
Waste Disposal Costs | |||||
Water Usage | $37,598 | 4,689 |
Tgal
|
$8.02 | |
TOTAL YEARLY COSTS | $211,795 | ||||
RECOMMENDED SAVINGS* | $37,689 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $9,956 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $23,170 | $22,956 |
$20,463
252,004
kWh
|
$2,707
-
kW-mo/yr
|
|
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,314 | $280 |
$7,360
90,643
kWh
|
$954
-
kW-mo/yr
|
|
03 | 2.7232: Replace existing hvac unit with high efficiency model | $3,682 | $13,900 |
$2,934
36,123
kWh
|
$748
-
kW-mo/yr
|
|
04 | 2.7261: Install timers and/or thermostats | $1,642 | $3,200 |
$1,642
20,218
kWh
|
- | |
05 | 2.6218: Turn off equipment when not in use | $881 | $350 |
$881
10,846
kWh
|
- | |
TOTAL RECOMMENDED | $37,689 | $40,686 |
$33,280
409,834
kWh
|
$4,409
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $9,956 | $3,480 |
$9,002
110,861
kWh
|
$954
-
kW-mo/yr
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs