Assessment Year 2018
Principal Product Gypsum Products
NAICS 327420: Gypsum Product Manufacturing
SIC 3275: Gypsum Products
Sales Range $10
M
to 50
M
# of Employees 20
Plant Area 87,000
ft2
Annual Production 60,000
ton
Production Hrs. Annual 5,754
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $131,921 1,624,000
kWh
Electricity Demand $22,413 4,440
kW-mo/yr
Electricity Fees $9,454 -
Fuel Oil #1 $10,409 867
MMBtu
Waste Disposal Costs
Water Usage $37,598 4,689
Tgal
TOTAL YEARLY COSTS $211,795
RECOMMENDED SAVINGS* $37,689 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,956

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4133: Use most efficient type of electric motors $23,170 $22,956 $20,463
252,004
kWh
$2,707
-
kW-mo/yr
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,314 $280 $7,360
90,643
kWh
$954
-
kW-mo/yr
03 2.7232: Replace existing hvac unit with high efficiency model $3,682 $13,900 $2,934
36,123
kWh
$748
-
kW-mo/yr
04 2.7261: Install timers and/or thermostats $1,642 $3,200 $1,642
20,218
kWh
-
05 2.6218: Turn off equipment when not in use $881 $350 $881
10,846
kWh
-
TOTAL RECOMMENDED $37,689 $40,686 $33,280
409,834
kWh
$4,409
-
kW-mo/yr
TOTAL IMPLEMENTED $9,956 $3,480 $9,002
110,861
kWh
$954
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs