ITAC Assessment: OR0597
ITAC logo
ITAC Assessment: OR0597
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Composite Cement Wood Board
NAICS 327420: Gypsum Product Manufacturing
SIC 3275: Gypsum Products
Sales Range $50
M
to 100
M
# of Employees 101
Plant Area 155,000
ft2
Annual Production 192,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $697,743 20,512,800
kWh
Electricity Demand $189,297 42,066
kW-mo/yr
Electricity Fees $120,673 -
Natural Gas $541,472 158,347
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $66,059 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,333

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,480 $9,480 $7,138
209,827
kWh
$1,342
-
kW-mo/yr
- -
02 2.4322: Use or replace with energy efficient substitutes $41,834 $41,834 $35,305
1,037,927
kWh
$6,529
-
kW-mo/yr
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $11,892 $11,892 $10,036
295,060
kWh
$1,856
-
kW-mo/yr
- -
04 2.7135: Install occupancy sensors $3,853 $3,853 $2,413
70,939
kWh
$11
-
kW-mo/yr
$349 $1,080
TOTAL RECOMMENDED $66,059 $67,059 $54,892
1,613,753
kWh
$9,738
-
kW-mo/yr
$349 $1,080
TOTAL IMPLEMENTED $12,333 $13,333 $9,551
280,766
kWh
$1,353
-
kW-mo/yr
$349 $1,080
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs