Assessment Year | 2002 |
---|---|
Principal Product | motor vechile parts |
NAICS |
n/a
|
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $50 M to 100M |
# of Employees | 62 |
Plant Area |
164,000
ft2
|
Annual Production | 7,200,000
pieces
|
Production Hrs. Annual | 3,840
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $209,147 | 6,337,800 |
kWh
|
$0.033 |
Electricity Demand | $161,102 | 17,340 |
kW-mo/yr
|
$9.29 |
Natural Gas | $59,932 | 8,006 |
MMBtu
|
$7.49 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $225,075 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $175,049 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 3.4114: Replace city water with recycled water via cooling tower | $91,917 | $40,580 | - | - | - |
$91,917
-
Tgal
|
- | - | |
02 | 4.623: Employ modular jigs to reduce process set-up time | $60,053 | $40,000 | - | - | - | - | $6,053 | $54,000 | |
03 | 3.5112: Reprocess spent oils on site for re-use | $42,000 | $54,000 | - | - | - | - | - | $42,000 | |
04 | 3.6192: Use a less expensive method of waste removal | $12,960 | $504 | - | - | - |
$12,960
-
Tgal
|
- | - | |
05 | 2.2437: Recover waste heat from equipment | $4,374 | $3,000 | - | - |
$4,374
-
MMBtu
|
- | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,190 | $10,260 |
$2,661
80,640
kWh
|
$1,529
-
kW-mo/yr
|
- | - | - | - | |
07 | 4.652: Replace existing equipment with more suitable substitutes | $3,456 | $6,000 | - | - | - | - | - | $3,456 | |
08 | 2.4225: Install common header on compressors | $2,408 | - |
$2,408
72,960
kWh
|
- | - | - | - | - | |
09 | 2.4133: Use most efficient type of electric motors | $2,123 | $4,332 |
$1,140
34,560
kWh
|
$983
-
kW-mo/yr
|
- | - | - | - | |
10 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,398 | $504 |
$634
19,200
kWh
|
$764
-
kW-mo/yr
|
- | - | - | - | |
11 | 2.4322: Use or replace with energy efficient substitutes | $196 | $300 |
$196
5,952
kWh
|
- | - | - | - | - | |
TOTAL RECOMMENDED | $225,075 | $159,480 |
$7,039
213,312
kWh
|
$3,276
-
kW-mo/yr
|
$4,374
-
MMBtu
|
$104,877
-
Tgal
|
$6,053 | $99,456 | ||
TOTAL IMPLEMENTED | $175,049 | $96,180 |
$6,843
207,360
kWh
|
$3,276
-
kW-mo/yr
|
- |
$104,877
-
Tgal
|
$6,053 | $54,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs