Assessment Year | 1995 |
---|---|
Principal Product | Railroad Frogs and Switches |
NAICS |
n/a
|
SIC | 3312: Steel Works, Blast Furnaces (Including Coke Ovens), and Rolling Mills |
Sales Range | $10 M to 50M |
# of Employees | 220 |
Plant Area |
98,000
ft2
|
Annual Production | 1,000
pieces
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $200,140 | 4,380,715 |
kWh
|
$0.046 |
Natural Gas | $64,006 | 16,254 |
MMBtu
|
$3.94 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $31,650 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $30,500 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $12,270 | $20,110 |
$12,270
246,483
kWh
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,390 | $29,330 |
$10,390
243,552
kWh
|
- | |
03 | 2.2437: Recover waste heat from equipment | $3,290 | $400 | - |
$3,290
-
MMBtu
|
|
04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $3,180 | $10,950 |
$(-1,010.0)
(-25,791)
kWh
|
$4,190
-
MMBtu
|
|
05 | 2.2414: Use waste heat from hot flue gases to preheat | $1,150 | $1,200 | - |
$1,150
-
MMBtu
|
|
06 | 2.4221: Install compressor air intakes in coolest locations | $930 | $280 |
$930
24,326
kWh
|
- | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $440 | $120 |
$440
11,137
kWh
|
- | |
TOTAL RECOMMENDED | $31,650 | $62,390 |
$23,020
499,707
kWh
|
$8,630
-
MMBtu
|
||
TOTAL IMPLEMENTED | $30,500 | $61,190 |
$23,020
499,707
kWh
|
$7,480
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs