ITAC Assessment: AS0033
ITAC logo
ITAC Assessment: AS0033
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product EXTRUDED ALUMINUM
NAICS
n/a
SIC 3354: Aluminum Extruded Products
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area
n/a
Annual Production 20,000,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $249,485 4,449,004
kWh
Natural Gas $82,738 41,369
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,589 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $1,774 $4,910 $1,774
31,653
kWh
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,078 - $4,078
72,685
kWh
03 2.4231: Reduce the pressure of compressed air to the minimum required $3,442 $40 $3,442
61,547
kWh
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,845 $100 $1,845
32,825
kWh
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,450 $2,862 $3,450
61,547
kWh
TOTAL RECOMMENDED $14,589 $7,912 $14,589
260,257
kWh
TOTAL IMPLEMENTED - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs