ITAC Assessment: SU0102
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Theatrical Rigging Equipment
NAICS
n/a
SIC 3999: Manufacturing Industries, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 43
Plant Area 20,000
ft2
Annual Production 0
units
Production Hrs. Annual 2,210
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $13,534 185,015
kWh
Electricity Demand $8,999 1,082
kW-mo/yr
Electricity Fees $1,378 -
Natural Gas $7,719 1,081
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $183,832 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,673

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Primary Product Savings Increase in Production Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $48 - $48
-
kWh
- - -
02 4.122: Develop standard procedures to improve internal yields $4,867 $234 - - - $4,867
03 2.7243: Improve air circulation with destratification fans / other methods $758 $1,323 - $758
-
MMBtu
- -
04 2.4226: Use / purchase optimum sized compressor $231 $250 $231
3,104
kWh
- - -
05 4.445: Install equipment to move product $30,000 $34,762 - - $30,000 -
06 2.7135: Install occupancy sensors $189 $244 $189
3,435
kWh
- - -
07 4.426: Modify workload $147,739 $201 - - $147,739 -
TOTAL RECOMMENDED $183,832 $37,014 $468
6,539
kWh
$758
-
MMBtu
$177,739 $4,867
TOTAL IMPLEMENTED $5,673 $1,557 $48
-
kWh
$758
-
MMBtu
- $4,867
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Primary Product Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs