Assessment Year | 2004 |
---|---|
Principal Product | Aluminum die cast brackets |
NAICS | 332710: Machine Shops |
SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
96,500
ft2
|
Annual Production | 240,000
pieces
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $96,362 | 2,906,442 |
kWh
|
$0.033 |
Electricity Demand | $69,704 | 6,850 |
kW-mo/yr
|
$10.18 |
Electricity Fees | $22,100 | - |
|
- |
Natural Gas | $40,283 | 8,171 |
MMBtu
|
$4.93 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $30,165 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $16,318 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4239: Eliminate or reduce compressed air usage | $7,760 | $16,000 |
$7,760
119,938
kWh
|
- | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,432 | $11,183 |
$4,909
140,256
kWh
|
$2,523
-
kW-mo/yr
|
- | - | |
03 | 2.7135: Install occupancy sensors | $3,044 | $1,680 |
$2,014
57,534
kWh
|
$1,030
-
kW-mo/yr
|
- | - | |
04 | 3.3131: Use evaporation to concentrate material | $5,458 | $18,000 | - | - |
$(-3,333.0)
-
MMBtu
|
$8,791
-
gal
|
|
05 | 2.1123: Install automatic stack damper | $2,736 | $1,900 | - | - |
$2,736
-
MMBtu
|
- | |
06 | 2.4112: Install soft-start to eliminate nuisance trips | $1,882 | $2,500 | - |
$1,882
-
kW-mo/yr
|
- | - | |
07 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,126 | $700 | - | - |
$1,126
-
MMBtu
|
- | |
08 | 2.7444: Close holes and openings in building such as broken windows | $727 | - | - | - |
$727
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $30,165 | $51,963 |
$14,683
317,728
kWh
|
$5,435
-
kW-mo/yr
|
$1,256
-
MMBtu
|
$8,791
-
gal
|
||
TOTAL IMPLEMENTED | $16,318 | $27,883 |
$12,669
260,194
kWh
|
$2,523
-
kW-mo/yr
|
$1,126
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs