322
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | Ready-mixed concrete | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
UU0286 #05 Y:2025 | 05 | 2025 | Utilize higher efficiency lamps and/or ballasts | $2,200 | $15,740 |
n/a
|
UU0286 #04 Y:2025 | 04 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,270 | $1,800 |
n/a
|
UU0286 #03 Y:2025 | 03 | 2025 | Replace fossil fuel equipment with electrical equipment | $18,569 | $141,050 |
n/a
|
UU0286 #02 Y:2025 | 02 | 2025 | Utilize controls to operate equipment only when needed | $59,940 | $100,340 |
n/a
|
UU0286 #01 Y:2025 | 01 | 2025 | Increase efficiency of trucks | $126,055 | $584,355 |
n/a
|
LE0570 #06 Y:2024 | 06 | 2024 | Install back-up equipment | $46,731 | $90,000 | |
LE0570 #05 Y:2024 | 05 | 2024 | Install compressor air intakes in coolest locations | $4,252 | $5,000 | |
LE0570 #04 Y:2024 | 04 | 2024 | Reduce the pressure of compressed air to the minimum required | $25,168 | $26,500 | |
LE0570 #03 Y:2024 | 03 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $55,246 | $42,000 | |
LE0570 #02 Y:2024 | 02 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $33,515 | $15,000 | |
LE0570 #01 Y:2024 | 01 | 2024 | Reschedule plant operations or reduce load to avoid peaks | $9,292 | - | |
UW2317 #05 Y:2023 | 05 | 2023 | Improve combustion control capability | $30,104 | $300,000 | |
UW2317 #04 Y:2023 | 04 | 2023 | Change product design to reduce energy requirements | $31,756 | $1,000,000 | |
UW2317 #03 Y:2023 | 03 | 2023 | Install storm windows and doors | $156 | $1,901 | |
UW2317 #02 Y:2023 | 02 | 2023 | Improve air circulation with destratification fans / other methods | $658 | $1,096 | |
UW2317 #01 Y:2023 | 01 | 2023 | Reduce the pressure of compressed air to the minimum required | $533 | - | |
UW2315 #03 Y:2023 | 03 | 2023 | Use double or triple glazed windows to maintain higher relative humidity and to reduce heat losses | $1,343 | $10,879 | |
UW2315 #02 Y:2023 | 02 | 2023 | Improve combustion control capability | $30,104 | $300,000 | |
UW2315 #01 Y:2023 | 01 | 2023 | Improve air circulation with destratification fans / other methods | $6,189 | $1,896 | |
WM0204 #05 Y:2023 | 05 | 2023 | Utilize energy-efficient belts and other improved mechanisms | $97 | $240 |