ITAC Assessment: WM0204
ITAC logo
ITAC Assessment: WM0204
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Ready Mixed Concrete
NAICS 327320: Ready-Mix Concrete Manufacturing
SIC 3273: Ready-Mixed Concrete
Sales Range $5
M
to 10
M
# of Employees 40
Plant Area 110,000
ft2
Annual Production 130,000
ton
Production Hrs. Annual 4,200
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $54,261 769,874
kWh
Electricity Demand $27,933 3,844
kW-mo/yr
Electricity Fees $19,000 -
Natural Gas $62,725 24,705
MMBtu
Waste Disposal Costs
Water Usage $45,747 8,309
Tgal
Water Disposal $45,747 8,309
Tgal
TOTAL YEARLY COSTS $255,413
RECOMMENDED SAVINGS* $25,634 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,108

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings
01 3.4116: Meter recycled water (to reduce sewer charges) $22,875 $1,950 - - $22,875
-
Tgal
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,440 $2,330 $1,261
18,012
kWh
$179
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $651 $1,001 $502
7,174
kWh
$149
-
kW-mo/yr
-
04 2.7135: Install occupancy sensors $571 $750 $440
6,290
kWh
$131
-
kW-mo/yr
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $97 $240 $87
1,245
kWh
$9
-
kW-mo/yr
-
TOTAL RECOMMENDED $25,634 $6,271 $2,290
32,721
kWh
$469
-
kW-mo/yr
$22,875
-
Tgal
TOTAL IMPLEMENTED $2,108 $3,320 $1,788
25,547
kWh
$320
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs