Assessment Year | 2011 |
---|---|
Principal Product | Turf maintenance equipment |
NAICS | 333112: Lawn and Garden Tractor and Home Lawn and Garden Equipment Manufacturing |
SIC | 3524: Lawn and Garden Tractors and Home Lawn and Garden Equipment |
Sales Range | $100 M to 500M |
# of Employees | 275 |
Plant Area |
270,000
ft2
|
Annual Production | 10,000
pieces
|
Production Hrs. Annual | 2,750
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $290,839 | 5,963,200 |
kWh
|
$0.049 |
Electricity Demand | $97,741 | 20,664 |
kW-mo/yr
|
$4.73 |
Natural Gas | $140,548 | 14,128 |
MMBtu
|
$9.95 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $108,039 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,826 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.1221: Replace obsolete burners with more efficient ones | $14,064 | $24,000 | - | - |
$14,064
-
MMBtu
|
- | - | - | |
02 | 2.1132: Repair faulty louvers and dampers | $7,824 | $2,500 | - | - |
$7,824
-
MMBtu
|
- | - | - | |
03 | 2.1117: Relocate oven / furnace to more efficient location | $1,290 | $3,700 | - | - |
$1,290
-
MMBtu
|
- | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,640 | $600 |
$1,372
26,248
kWh
|
$268
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $126 | $177 |
$98
1,879
kWh
|
$28
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $16,893 | $72,000 |
$27,221
623,538
kWh
|
$26,327
-
kW-mo/yr
|
- |
$(-107,855.0)
-
MMBtu
|
$71,200 | - | |
07 | 2.2437: Recover waste heat from equipment | $8,060 | $30,000 |
$(-629.0)
(-10,071)
kWh
|
$(-103.0)
-
kW-mo/yr
|
$8,792
-
MMBtu
|
- | - | - | |
08 | 2.4226: Use / purchase optimum sized compressor | $4,236 | $8,420 |
$4,236
120,852
kWh
|
- | - | - | - | - | |
09 | 2.6218: Turn off equipment when not in use | $53,906 | $1,000 |
$3,655
69,930
kWh
|
$834
-
kW-mo/yr
|
$56,998
-
MMBtu
|
- | - | $(-7,581.0) | |
TOTAL RECOMMENDED | $108,039 | $142,397 |
$35,953
832,376
kWh
|
$27,354
-
kW-mo/yr
|
$88,968
-
MMBtu
|
$(-107,855.0)
-
MMBtu
|
$71,200 | $(-7,581.0) | ||
TOTAL IMPLEMENTED | $13,826 | $11,697 |
$5,706
148,979
kWh
|
$296
-
kW-mo/yr
|
$7,824
-
MMBtu
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs