Assessment Year | 2017 |
---|---|
Principal Product | Perlite |
NAICS | 327992: Ground or Treated Mineral and Earth Manufacturing |
SIC | 3295: Minerals and Earths, Ground or Otherwise Treated |
Sales Range | $1 M to 5M |
# of Employees | 21 |
Plant Area |
16,350
ft2
|
Annual Production | 3,500
ton
|
Production Hrs. Annual | 3,900
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $32,171 | 275,040 |
kWh
|
$0.12 |
Electricity Demand | $4,434 | 1,097 |
kW-mo/yr
|
$4.04 |
Electricity Fees | $1,260 | - |
|
- |
Natural Gas | $112,863 | 20,729 |
MMBtu
|
$5.44 |
TOTAL YEARLY COSTS | $150,728 | |||
RECOMMENDED SAVINGS* | $29,883 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,687 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,125 | $20 |
$1,033
8,825
kWh
|
$93
-
kW-mo/yr
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,469 | $1,000 |
$3,183
27,202
kWh
|
$287
-
kW-mo/yr
|
- | |
03 | 2.7232: Replace existing hvac unit with high efficiency model | $1,249 | $3,100 |
$1,192
10,192
kWh
|
$57
-
kW-mo/yr
|
- | |
04 | 2.2443: Re-use or recycle hot or cold process exhaust air | $18,948 | $76,000 | - | - |
$18,948
-
MMBtu
|
|
05 | 2.4226: Use / purchase optimum sized compressor | $5,092 | $23,000 |
$4,672
39,933
kWh
|
$420
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $29,883 | $103,120 |
$10,080
86,152
kWh
|
$856
-
kW-mo/yr
|
$18,948
-
MMBtu
|
||
TOTAL IMPLEMENTED | $9,687 | $24,020 |
$8,887
75,960
kWh
|
$800
-
kW-mo/yr
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs