Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

145

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Pesticides and agricultural chemicals, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AM0838 #03 Y:2021 Use most efficient type of electric motors $2,070 $10,152
AM0838 #02 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $12,090 $5,000
AM0838 #01 Y:2021 Apply for tax-free status for energy purchases $123,505 $10,000
LS2107 #06 Y:2021 Utilize energy-efficient belts and other improved mechanisms $229 $326
LS2107 #05 Y:2021 Install automatic packing equipment $137,875 $144,000
LS2107 #04 Y:2021 Utilize higher efficiency lamps and/or ballasts $9,971 $5,165
LS2107 #03 Y:2021 Chill water to the highest temperature possible $981 $250
LS2107 #02 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $4,148 $450
LS2107 #01 Y:2021 Reduce the pressure of compressed air to the minimum required $425 $25
AS0472 #05 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $4,692 $770
AS0472 #04 Y:2019 Use fixtures to reduce machine changeout times $4,878 $6,000
AS0472 #03 Y:2019 Use most efficient type of electric motors $19,102 $53,286
AS0472 #02 Y:2019 Upgrade controls on compressors $20,091 $41,520
AS0472 #01 Y:2019 Use solar heat to make electricty $95,737 $8,636
MS0338 #05 Y:2008 Analyze flue gas for proper air/fuel ratio $1,926 $1,000
MS0338 #04 Y:2008 Utilize energy-efficient belts and other improved mechanisms $7,526 $1,875
MS0338 #03 Y:2008 Eliminate leaks in inert gas and compressed air lines/ valves $12,055 $401
MS0338 #02 Y:2008 Utilize higher efficiency lamps and/or ballasts $15,890 $26,454
MS0338 #01 Y:2008 Utilize higher efficiency lamps and/or ballasts $48,260 $40,176
MS0317 #04 Y:2007 Utilize energy-efficient belts and other improved mechanisms $711 $3,675