ITAC Assessment: MS0317
ITAC logo
ITAC Assessment: MS0317
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Pesticide
NAICS 325320: Pesticide and Other Agricultural Chemical Manufacturing
SIC 2879: Pesticides and Agricultural Chemicals, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 91
Plant Area 96,000
ft2
Annual Production 4,000
Tgal
Production Hrs. Annual 6,240
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $71,541 1,026,080
kWh
Electricity Demand $28,293 5,021
kW-mo/yr
Electricity Fees $1,997 -
LPG $16,752 922
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,477 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,745

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,793 $4,598 $3,059
52,749
kWh
$659
-
kW-mo/yr
$75
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,952 $236 $2,894
49,895
kWh
- $58
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,021 $4,749 $738
12,726
kWh
$262
-
kW-mo/yr
$21
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $711 $3,675 $377
6,508
kWh
$320
-
kW-mo/yr
$14
TOTAL RECOMMENDED $8,477 $13,258 $7,068
121,878
kWh
$1,241
-
kW-mo/yr
$168
TOTAL IMPLEMENTED $6,745 $4,834 $5,953
102,644
kWh
$659
-
kW-mo/yr
$133
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs