ITAC Assessment: AS0472
ITAC logo
ITAC Assessment: AS0472
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Herbicides and Other Agricultural Chemical Manufacturing
NAICS 325320: Pesticide and Other Agricultural Chemical Manufacturing
SIC 2879: Pesticides and Agricultural Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 2,614,000
ft2
Annual Production 10,000
ton
Production Hrs. Annual 7,884
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $153,171 3,354,000
kWh
Electricity Demand $419,980 25,106
kW-mo/yr
Electricity Fees $15,294 -
Natural Gas $197,542 27,586
MMBtu
TOTAL YEARLY COSTS $785,987
RECOMMENDED SAVINGS* $144,500 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,692

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Primary Product Savings
01 2.9114: Use solar heat to make electricty $95,737 $8,636 $63,766
1,395,321
kWh
$31,971
-
kW-mo/yr
-
02 2.4224: Upgrade controls on compressors $20,091 $41,520 $12,902
282,326
kWh
$7,189
-
kW-mo/yr
-
03 2.4133: Use most efficient type of electric motors $19,102 $53,286 $12,636
276,504
kWh
$6,466
-
kW-mo/yr
-
04 4.621: Use fixtures to reduce machine changeout times $4,878 $6,000 $(-216.0)
(-4,724)
kWh
$(-120.3)
-
kW-mo/yr
$5,214
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,692 $770 $3,013
65,933
kWh
$1,679
-
kW-mo/yr
-
TOTAL RECOMMENDED $144,500 $110,212 $92,101
2,015,360
kWh
$47,185
-
kW-mo/yr
$5,214
TOTAL IMPLEMENTED $4,692 $770 $3,013
65,933
kWh
$1,679
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs