| Assessment Year | 2019 |
|---|---|
| Principal Product | Herbicides and Other Agricultural Chemical Manufacturing |
| NAICS | 325320: Pesticide and Other Agricultural Chemical Manufacturing |
| SIC | 2879: Pesticides and Agricultural Chemicals, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 300 |
| Plant Area |
2,614,000
ft2
|
| Annual Production | 10,000
ton
|
| Production Hrs. Annual | 7,884
hrs
|
| Location (State) | Arizona |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $153,171 | 3,354,000 |
kWh
|
$0.046 |
| Electricity Demand | $419,980 | 25,106 |
kW-mo/yr
|
$16.73 |
| Electricity Fees | $15,294 | - |
|
- |
| Natural Gas | $197,542 | 27,586 |
MMBtu
|
$7.16 |
| TOTAL YEARLY COSTS | $785,987 | |||
| RECOMMENDED SAVINGS* | $144,500 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $4,692 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.9114: Use solar heat to make electricty | $95,737 | $8,636 |
$63,766
1,395,321
kWh
|
$31,971
-
kW-mo/yr
|
- | |
| 02 | 2.4224: Upgrade controls on compressors | $20,091 | $41,520 |
$12,902
282,326
kWh
|
$7,189
-
kW-mo/yr
|
- | |
| 03 | 2.4133: Use most efficient type of electric motors | $19,102 | $53,286 |
$12,636
276,504
kWh
|
$6,466
-
kW-mo/yr
|
- | |
| 04 | 4.621: Use fixtures to reduce machine changeout times | $4,878 | $6,000 |
$(-216.0)
(-4,724)
kWh
|
$(-120.3)
-
kW-mo/yr
|
$5,214 | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,692 | $770 |
$3,013
65,933
kWh
|
$1,679
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $144,500 | $110,212 |
$92,101
2,015,360
kWh
|
$47,185
-
kW-mo/yr
|
$5,214 | ||
| TOTAL IMPLEMENTED | $4,692 | $770 |
$3,013
65,933
kWh
|
$1,679
-
kW-mo/yr
|
- | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs