ITAC Assessment: LS2107
ITAC logo
ITAC Assessment: LS2107
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Herbicide
NAICS 325320: Pesticide and Other Agricultural Chemical Manufacturing
SIC 2879: Pesticides and Agricultural Chemicals, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 48
Plant Area 93,500
ft2
Annual Production 10,000,000
lb
Production Hrs. Annual 2,860
hrs
Location (State) Louisiana
View Case Study

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $109,538 870,912
kWh
TOTAL YEARLY COSTS $109,538
RECOMMENDED SAVINGS* $153,629 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,525

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Personnel Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $425 $25 $425
3,375
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,148 $450 $4,148
32,977
kWh
-
03 2.2625: Chill water to the highest temperature possible $981 $250 $981
7,800
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $9,971 $5,165 $9,971
79,277
kWh
-
05 4.441: Install automatic packing equipment $137,875 $144,000 - $137,875
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $229 $326 $229
1,819
kWh
-
TOTAL RECOMMENDED $153,629 $150,216 $15,754
125,248
kWh
$137,875
TOTAL IMPLEMENTED $15,525 $5,890 $15,525
123,429
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs