ITAC Assessment: IP0191
ITAC logo
ITAC Assessment: IP0191
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Automotive Components
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 259
Plant Area 144,000
ft2
Annual Production 2,902,000
pieces
Production Hrs. Annual 1,824
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $480,112 4,650,510
kWh
Electricity Fees $2,851 -
Natural Gas $148,437 21,294
MMBtu
Waste Disposal Costs
Water Usage $16,069 3,553
Tgal
TOTAL YEARLY COSTS $647,469
RECOMMENDED SAVINGS* $149,765 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4239: Eliminate or reduce compressed air usage $18,779 - $18,779
181,966
kWh
-
02 2.2211: Use optimum temperature $4,978 $384 $3,932
38,097
kWh
$1,046
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,730 $735 $3,730
36,141
kWh
-
04 2.2437: Recover waste heat from equipment $27,225 $8,610 - $27,225
-
MMBtu
05 2.2221: Use immersion heating in tanks, melting pots, etc $1,226 $984 $1,226
11,892
kWh
-
06 2.4133: Use most efficient type of electric motors $87,660 $91,077 $87,660
849,423
kWh
-
07 2.2437: Recover waste heat from equipment $5,739 $13,340 - $5,739
-
MMBtu
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $428 $1,099 $428
4,146
kWh
-
TOTAL RECOMMENDED $149,765 $116,229 $115,755
1,121,665
kWh
$34,010
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs