Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,221

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Pharmaceutical preparations
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MI0048 #01 Y:2002 Add equipment/ operators to reduce production bottleneck $1,989,000 $115,000
MI0047 #06 Y:2002 Eliminate leaks in inert gas and compressed air lines/ valves $4,225 $52
MI0047 #05 Y:2002 Add area lighting switches $10,502 $3,900
MI0047 #04 Y:2002 Reduce the pressure of compressed air to the minimum required $10,129 $1,916
MI0047 #03 Y:2002 Repair faulty insulation in furnaces, boilers, etc $12,504 $209
MI0047 #02 Y:2002 Change procedures / equipment / operating conditions $22,579 $7
MI0047 #01 Y:2002 Replace existing hvac unit with high efficiency model $58,883 $34,500
MI0045 #05 Y:2002 Add area lighting switches $2,961 $1,550
MI0045 #04 Y:2002 Change procedures / equipment / operating conditions $3,500 $7
MI0045 #03 Y:2002 Replace existing hvac unit with high efficiency model $6,814 $5,700
MI0045 #02 Y:2002 Develop standard procedures to improve internal yields $20,280 $650
MI0045 #01 Y:2002 Change procedures / equipment / operating conditions $315,000 $75,000
MI0043 #05 Y:2002 Meter waste water $1,102 $1,454
MI0043 #04 Y:2002 Use most efficient type of electric motors $1,637 $5,036
MI0043 #03 Y:2002 Improve space comfort conditioning $3,500 $2,000
MI0043 #02 Y:2002 Reschedule plant operations or reduce load to avoid peaks $16,945 $250
MI0043 #01 Y:2002 Install soft-start to eliminate nuisance trips $50,836 $17,690
LE0129 #05 Y:2001 Install compressor air intakes in coolest locations $1,270 $1,000
LE0129 #04 Y:2001 Improve lubrication practices $361 $200
LE0129 #03 Y:2001 Utilize energy-efficient belts and other improved mechanisms $723 -