ITAC Assessment: MI0045
ITAC logo
ITAC Assessment: MI0045
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Pharmaceutical
NAICS
n/a
SIC 2834: Pharmaceutical Preparations
Sales Range $1
M
to 5
M
# of Employees 56
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,295
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $73,774 1,165,855
kWh
Electricity Demand $22,384 3,090
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $348,555 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $342,094

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
01 3.1191: Change procedures / equipment / operating conditions $315,000 $75,000 - $315,000 -
02 4.122: Develop standard procedures to improve internal yields $20,280 $650 - - $20,280
03 2.7232: Replace existing hvac unit with high efficiency model $6,814 $5,700 $6,814
113,568
kWh
- -
04 3.1191: Change procedures / equipment / operating conditions $3,500 $7 $3,500
58,320
kWh
- -
05 2.7131: Add area lighting switches $2,961 $1,550 $2,961
49,341
kWh
- -
TOTAL RECOMMENDED $348,555 $82,907 $13,275
221,229
kWh
$315,000 $20,280
TOTAL IMPLEMENTED $342,094 $81,350 $6,814
113,568
kWh
$315,000 $20,280
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs