Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Antacids/Gas relief tablets
NAICS
n/a
SIC 2834: Pharmaceutical Preparations
Sales Range $5
M
to 10
M
# of Employees 88
Plant Area 127,385
ft2
Annual Production 0
units
Production Hrs. Annual 2,850
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $303,352 3,155,554
kWh
Electricity Demand $73,497 9,156
kW-mo/yr
Natural Gas $120,337 18,716
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,992 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,361

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $11,028 $2,500 - $11,028
-
kW-mo/yr
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $3,610 $500 - - $3,610
-
MMBtu
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $723 - $438
5,909
kWh
$285
-
kW-mo/yr
-
04 2.4312: Improve lubrication practices $361 $200 $248
3,348
kWh
$113
-
kW-mo/yr
-
05 2.4221: Install compressor air intakes in coolest locations $1,270 $1,000 $769
10,367
kWh
$501
-
kW-mo/yr
-
TOTAL RECOMMENDED $16,992 $4,200 $1,455
19,624
kWh
$11,927
-
kW-mo/yr
$3,610
-
MMBtu
TOTAL IMPLEMENTED $15,361 $3,000 $438
5,909
kWh
$11,313
-
kW-mo/yr
$3,610
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs