ITAC Assessment: OK0059
ITAC logo
ITAC Assessment: OK0059
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product AUTO-LEAFSPRINGS
NAICS
n/a
SIC 3493: Steel Springs, Except Wire
Sales Range $5
M
to 10
M
# of Employees 40
Plant Area
n/a
Annual Production 100,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $7,019 126,319
kWh
Natural Gas $16,507 5,993
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,548 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,327

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $473 $283 $473
8,206
kWh
-
02 2.7261: Install timers and/or thermostats $204 $600 - $204
-
MMBtu
03 2.4231: Reduce the pressure of compressed air to the minimum required $122 - $122
2,052
kWh
-
04 2.7292: Lower ceiling to reduce conditioned space $230 $1,137 - $230
-
MMBtu
05 2.1233: Analyze flue gas for proper air/fuel ratio $422 $500 - $422
-
MMBtu
06 2.1131: Repair faulty insulation in furnaces, boilers, etc $2,097 $984 - $2,097
-
MMBtu
TOTAL RECOMMENDED $3,548 $3,504 $595
10,258
kWh
$2,953
-
MMBtu
TOTAL IMPLEMENTED $2,327 $2,121 - $2,327
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings