ITAC Assessment: CL1703
ITAC logo
ITAC Assessment: CL1703
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Skylights and sun tunnels
NAICS 332321: Metal Window and Door Manufacturing
SIC 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing
Sales Range $50
M
to 100
M
# of Employees 375
Plant Area 4,539,823
ft2
Annual Production 50,000
units
Production Hrs. Annual 5,000
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $385,325 5,800,467
kWh
Electricity Demand $68,028 15,219
kW-mo/yr
Natural Gas $82,480 10,798
MMBtu
Waste Disposal Costs
Water Usage $21,000 3,381
Tgal
TOTAL YEARLY COSTS $556,833
RECOMMENDED SAVINGS* $79,061 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $64,326

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $33,383 $20,450 $28,819
433,820
kWh
$4,564
-
kW-mo/yr
-
02 2.4239: Eliminate or reduce compressed air usage $28,843 - $28,310
426,167
kWh
$533
-
kW-mo/yr
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $14,735 - $12,493
188,057
kWh
$2,242
-
kW-mo/yr
-
04 3.4156: Use flow control valves on equipment to optimize water use $2,100 $2,000 - - $2,100
-
Tgal
TOTAL RECOMMENDED $79,061 $22,450 $69,622
1,048,044
kWh
$7,339
-
kW-mo/yr
$2,100
-
Tgal
TOTAL IMPLEMENTED $64,326 $22,450 $57,129
859,987
kWh
$5,097
-
kW-mo/yr
$2,100
-
Tgal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs