ITAC Assessment: MA0254
ITAC logo
ITAC Assessment: MA0254
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product INJECT. MOLDED PLASTICS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 155
Plant Area
n/a
Annual Production 21,000,000
lb
Production Hrs. Annual 7,728
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $988,288 13,745,311
kWh
Natural Gas $40,661 6,371
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $106,008 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2443: Re-use or recycle hot or cold process exhaust air $45,335 $164,025 $13,843
192,556
kWh
$31,492
-
MMBtu
02 2.6212: Turn off equipment during breaks, reduce operating time $35,756 - $35,756
497,362
kWh
-
03 2.6231: Utilize controls to operate equipment only when needed $11,589 $31,600 $11,589
161,196
kWh
-
04 2.2223: Enhance sensitivity of temperature control and cutoff $9,355 $29,200 $9,355
130,129
kWh
-
05 2.7447: Install vinyl strip / high speed / air curtain doors $1,908 $785 - $1,908
-
MMBtu
06 2.2511: Insulate bare equipment $1,285 $320 $1,285
17,878
kWh
-
07 2.6232: Install set-back timers $780 $330 $780
10,844
kWh
-
TOTAL RECOMMENDED $106,008 $226,260 $72,608
1,009,965
kWh
$33,400
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs