Assessment Year | 1995 |
---|---|
Principal Product | Chrome Plating of different types of products |
NAICS |
n/a
|
SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
185,000
ft2
|
Annual Production | 80,000
lb
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $369,162 | 6,626,319 |
kWh
|
$0.056 |
Natural Gas | $104,395 | 20,257 |
MMBtu
|
$5.15 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $63,864 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $29,259 | $120,000 | n/a |
$70,204
1,259,965
kWh
|
$(-40,945.0)
-
MMBtu
|
02 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $12,574 | $6,250 | n/a | - |
$12,574
-
MMBtu
|
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $11,927 | $270 | n/a |
$11,927
213,951
kWh
|
- |
04 | 2.2437: Recover waste heat from equipment | $2,299 | $1,000 | n/a | - |
$2,299
-
MMBtu
|
05 | 2.4221: Install compressor air intakes in coolest locations | $750 | $640 | n/a |
$750
13,482
kWh
|
- |
06 | 2.2514: Cover open tanks | $4,164 | $2,400 | n/a | - |
$4,164
-
MMBtu
|
07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,594 | $500 | n/a | - |
$1,594
-
MMBtu
|
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $504 | - | n/a |
$504
9,086
kWh
|
- |
09 | 2.7135: Install occupancy sensors | $483 | $225 | n/a |
$483
8,792
kWh
|
- |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $310 | $631 | n/a |
$310
5,569
kWh
|
- |
TOTAL RECOMMENDED | $63,864 | $131,916 |
$84,178
1,510,845
kWh
|
$(-20,314.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs