| Assessment Year | 2019 |
|---|---|
| Principal Product | Low Voltage Electrical Drives |
| NAICS | 335314: Relay and Industrial Control Manufacturing |
| SIC | 3625: Relays and Industrial Controls |
| Sales Range | $100 M to 500M |
| # of Employees | 291 |
| Plant Area |
130,000
ft2
|
| Annual Production | 181,962
pieces
|
| Production Hrs. Annual | 7,200
hrs
|
| Location (State) | Wisconsin |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $227,296 | 3,656,735 |
kWh
|
$0.062 | |
| Electricity Demand | $154,148 | 11,402 |
kW-mo/yr
|
$13.52 | |
| Natural Gas | $38,178 | 6,512 |
MMBtu
|
$5.86 | |
| Waste Disposal Costs | |||||
| Water Usage | $10,040 | 2,360 |
Tgal
|
$4.25 | |
| TOTAL YEARLY COSTS | $429,662 | ||||
| RECOMMENDED SAVINGS* | $44,804 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $35,508 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.9114: Use solar heat to make electricty | $18,432 | $51,563 |
$18,432
280,931
kWh
|
- | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $15,984 | $27,284 |
$11,726
188,755
kWh
|
$4,259
-
kW-mo/yr
|
- | |
| 03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $2,570 | $745 | - | - |
$2,570
-
MMBtu
|
|
| 04 | 2.4221: Install compressor air intakes in coolest locations | $2,464 | $1,711 |
$1,428
22,984
kWh
|
$1,036
-
kW-mo/yr
|
- | |
| 05 | 2.1123: Install automatic stack damper | $1,941 | $2,080 |
$1,427
22,964
kWh
|
$514
-
kW-mo/yr
|
- | |
| 06 | 2.7444: Close holes and openings in building such as broken windows | $1,102 | $230 | - | - |
$1,102
-
MMBtu
|
|
| 07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,092 | - |
$801
12,891
kWh
|
$291
-
kW-mo/yr
|
- | |
| 08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $637 | $510 |
$637
10,255
kWh
|
- | - | |
| 09 | 2.7447: Install vinyl strip / high speed / air curtain doors | $582 | $70 |
$448
7,206
kWh
|
$134
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $44,804 | $84,193 |
$34,900
545,986
kWh
|
$6,232
-
kW-mo/yr
|
$3,672
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $35,508 | $78,847 |
$30,959
482,577
kWh
|
$4,549
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs