ITAC Assessment: WM0140
ITAC logo
ITAC Assessment: WM0140
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Low Voltage Electrical Drives
NAICS 335314: Relay and Industrial Control Manufacturing
SIC 3625: Relays and Industrial Controls
Sales Range $100
M
to 500
M
# of Employees 291
Plant Area 130,000
ft2
Annual Production 181,962
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $227,296 3,656,735
kWh
Electricity Demand $154,148 11,402
kW-mo/yr
Natural Gas $38,178 6,512
MMBtu
Waste Disposal Costs
Water Usage $10,040 2,360
Tgal
TOTAL YEARLY COSTS $429,662
RECOMMENDED SAVINGS* $44,804 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $35,508

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $18,432 $51,563 $18,432
280,931
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $15,984 $27,284 $11,726
188,755
kWh
$4,259
-
kW-mo/yr
-
03 2.7447: Install vinyl strip / high speed / air curtain doors $2,570 $745 - - $2,570
-
MMBtu
04 2.4221: Install compressor air intakes in coolest locations $2,464 $1,711 $1,428
22,984
kWh
$1,036
-
kW-mo/yr
-
05 2.1123: Install automatic stack damper $1,941 $2,080 $1,427
22,964
kWh
$514
-
kW-mo/yr
-
06 2.7444: Close holes and openings in building such as broken windows $1,102 $230 - - $1,102
-
MMBtu
07 2.4231: Reduce the pressure of compressed air to the minimum required $1,092 - $801
12,891
kWh
$291
-
kW-mo/yr
-
08 2.4231: Reduce the pressure of compressed air to the minimum required $637 $510 $637
10,255
kWh
- -
09 2.7447: Install vinyl strip / high speed / air curtain doors $582 $70 $448
7,206
kWh
$134
-
kW-mo/yr
-
TOTAL RECOMMENDED $44,804 $84,193 $34,900
545,986
kWh
$6,232
-
kW-mo/yr
$3,672
-
MMBtu
TOTAL IMPLEMENTED $35,508 $78,847 $30,959
482,577
kWh
$4,549
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs