Assessment Year | 2017 |
---|---|
Principal Product | Corrugated Boxes |
NAICS | 322211: Corrugated and Solid Fiber Box Manufacturing |
SIC | 2679: Converted Paper and Paperboard Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 23 |
Plant Area |
67,461
ft2
|
Annual Production | 1,000,000
units
|
Production Hrs. Annual | 4,992
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $156,053 | 2,002,600 |
kWh
|
$0.078 |
Electricity Demand | $23,407 | 7,265 |
kW-mo/yr
|
$3.22 |
Electricity Fees | $5,640 | - |
|
- |
Natural Gas | $47,269 | 5,908 |
MMBtu
|
$8.00 |
TOTAL YEARLY COSTS | $232,369 | |||
RECOMMENDED SAVINGS* | $46,006 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,827 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7261: Install timers and/or thermostats | $1,784 | $28 |
$48
620
kWh
|
- |
$1,736
-
MMBtu
|
|
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,031 | $1,000 |
$2,757
35,347
kWh
|
$274
-
kW-mo/yr
|
- | |
03 | 2.2437: Recover waste heat from equipment | $2,560 | $1,080 | - | - |
$2,560
-
MMBtu
|
|
04 | 2.4221: Install compressor air intakes in coolest locations | $576 | $300 |
$521
6,682
kWh
|
$55
-
kW-mo/yr
|
- | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $25,921 | $65,000 |
$23,580
302,303
kWh
|
$2,341
-
kW-mo/yr
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,129 | $5,350 |
$2,129
27,300
kWh
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $483 | $1,450 |
$406
5,200
kWh
|
$77
-
kW-mo/yr
|
- | |
08 | 2.4226: Use / purchase optimum sized compressor | $9,523 | $40,000 |
$8,663
111,064
kWh
|
$860
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $46,006 | $114,208 |
$38,104
488,516
kWh
|
$3,606
-
kW-mo/yr
|
$4,296
-
MMBtu
|
||
TOTAL IMPLEMENTED | $4,827 | $2,558 |
$454
5,820
kWh
|
$77
-
kW-mo/yr
|
$4,296
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs