ITAC Assessment: LL0350
ITAC logo
ITAC Assessment: LL0350
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product sand and gravel
NAICS 212322: Industrial Sand Mining
SIC 1446: Industrial Sand
Sales Range $5
M
to 10
M
# of Employees 16
Plant Area 9,000
ft2
Annual Production 1,200,000
ton
Production Hrs. Annual 5,000
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $325,430 5,076,674
kWh
Electricity Demand $181,797 19,795
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $91,060 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,579

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $87,490 $144,239 $87,490
1,364,900
kWh
- - -
02 4.611: Begin a practice of predictive / preventative maintenance $1,558 $150 $58
902
kWh
- $1,500 -
03 2.7224: Reduce space conditioning during non-working hours $1,021 $270 $1,021
15,930
kWh
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $390 $1,995 $390
6,088
kWh
- - -
05 2.6211: Conserve energy by efficient use of vending machines $268 $375 $224
3,494
kWh
$44
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $223 $140 $85
1,328
kWh
$17
-
kW-mo/yr
$73 $49
07 2.7135: Install occupancy sensors $110 $300 $110
1,714
kWh
- - -
TOTAL RECOMMENDED $91,060 $147,469 $89,378
1,394,356
kWh
$61
-
kW-mo/yr
$1,573 $49
TOTAL IMPLEMENTED $2,579 $420 $1,079
16,832
kWh
- $1,500 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs