ITAC Assessment: MI0043
ITAC logo
ITAC Assessment: MI0043
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Pharmaceurical
NAICS
n/a
SIC 2834: Pharmaceutical Preparations
Sales Range greater than $500
M
# of Employees 5,800
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 6,552
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $306,720 5,112,000
kWh
Electricity Demand $78,609 9,576
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $74,020 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,500

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings
01 2.4112: Install soft-start to eliminate nuisance trips $50,836 $17,690 - $50,836
-
kW-mo/yr
-
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $16,945 $250 - $16,945
-
kW-mo/yr
-
03 4.424: Improve space comfort conditioning $3,500 $2,000 $3,500
58,339
kWh
- -
04 2.4133: Use most efficient type of electric motors $1,637 $5,036 $1,329
15,026
kWh
$308
-
kW-mo/yr
-
05 3.4155: Meter waste water $1,102 $1,454 - - $1,102
-
Tgal
TOTAL RECOMMENDED $74,020 $26,430 $4,829
73,365
kWh
$68,089
-
kW-mo/yr
$1,102
-
Tgal
TOTAL IMPLEMENTED $3,500 $2,000 $3,500
58,339
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs