ITAC Assessment: MI0047
ITAC logo
ITAC Assessment: MI0047
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Pharmaceutical
NAICS
n/a
SIC 2834: Pharmaceutical Preparations
Sales Range n/a
# of Employees 150
Plant Area 113,344
ft2
Annual Production 640,000,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $213,249 3,934,530
kWh
Electricity Demand $68,124 8,640
kW-mo/yr
LPG $70,702 353,510
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $118,822 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,225

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.7232: Replace existing hvac unit with high efficiency model $58,883 $34,500 n/a $57,998
1,090,432
kWh
$885
-
kW-mo/yr
-
02 3.1191: Change procedures / equipment / operating conditions $22,579 $7 $22,579
418,132
kWh
- -
03 2.1131: Repair faulty insulation in furnaces, boilers, etc $12,504 $209 $12,504
227,322
kWh
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $10,129 $1,916 $10,129
168,820
kWh
- -
05 2.7131: Add area lighting switches $10,502 $3,900 $10,502
194,480
kWh
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,225 $52 - - $4,225
TOTAL RECOMMENDED $118,822 $40,584 $113,712
2,099,186
kWh
$885
-
kW-mo/yr
$4,225
TOTAL IMPLEMENTED $4,225 $52 - - $4,225
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs