1,221
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Pharmaceutical preparations | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| MI0107 #01 Y:2005 | 01 | 2005 | Change rate schedules or other changes in utility service | $5,544 | $600 | |
| MI0097 #06 Y:2004 | 06 | 2004 | Use / purchase optimum sized compressor | $28,209 | $71,500 | |
| MI0097 #05 Y:2004 | 05 | 2004 | Lower temperature during the winter season and vice-versa | $3,188 | $7,077 | |
| MI0097 #04 Y:2004 | 04 | 2004 | Analyze flue gas for proper air/fuel ratio | $5,883 | $30 | |
| MI0097 #03 Y:2004 | 03 | 2004 | Use adjustable frequency drive or multiple speed motors on existing system | $24,212 | $52,535 | |
| MI0097 #02 Y:2004 | 02 | 2004 | Turn off equipment when not in use | $59,412 | $800 | |
| MI0097 #01 Y:2004 | 01 | 2004 | Change rate schedules or other changes in utility service | $3,490 | $2,100 | |
| UU0071 #05 Y:2004 | 05 | 2004 | Use photocell controls | $2,376 | $2,400 | |
| UU0071 #04 Y:2004 | 04 | 2004 | Recover waste heat from equipment | $1,950 | $400 | |
| UU0071 #03 Y:2004 | 03 | 2004 | Use most efficient type of electric motors | $1,655 | $3,894 | |
| UU0071 #02 Y:2004 | 02 | 2004 | Reschedule plant operations or reduce load to avoid peaks | $3,294 | - | |
| UU0071 #01 Y:2004 | 01 | 2004 | Optimize plant power factor | $3,645 | $2,000 | |
| MI0091 #05 Y:2004 | 05 | 2004 | Eliminate old stock and modify inventory control | $2,500 | $120 | |
| MI0091 #04 Y:2004 | 04 | 2004 | Add equipment/ operators to reduce production bottleneck | $26,520 | $1,000 | |
| MI0091 #03 Y:2004 | 03 | 2004 | Eliminate or reduce compressed air usage | $1,670 | $3,105 | |
| MI0091 #02 Y:2004 | 02 | 2004 | Lower temperature during the winter season and vice-versa | $7,075 | $150 | |
| MI0091 #01 Y:2004 | 01 | 2004 | Turn off equipment when not in use | $19,034 | $35,520 | |
| UU0064 #06 Y:2004 | 06 | 2004 | Change rate schedules or other changes in utility service | $5,480 | - | |
| UU0064 #05 Y:2004 | 05 | 2004 | Turn off equipment when not in use | $1,785 | - | |
| UU0064 #04 Y:2004 | 04 | 2004 | Recover waste heat from equipment | $1,252 | $1,754 |