ITAC Assessment: MI0091
ITAC logo
ITAC Assessment: MI0091
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Natural Vitamins, Herbal Products
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 44,000
ft2
Annual Production 1,500,000
pieces
Production Hrs. Annual 4,250
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $62,362 1,227,117
kWh
Electricity Demand $23,362 3,343
kW-mo/yr
Electricity Fees $16,269 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $56,799 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $45,554

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Personnel Changes Savings Administrative Changes Savings
01 2.6218: Turn off equipment when not in use $19,034 $35,520 $20,334
386,601
kWh
$(-1,300.0) -
02 2.7221: Lower temperature during the winter season and vice-versa $7,075 $150 $7,075
134,678
kWh
- -
03 2.4239: Eliminate or reduce compressed air usage $1,670 $3,105 $1,670
30,971
kWh
- -
04 4.111: Add equipment/ operators to reduce production bottleneck $26,520 $1,000 - $26,520 -
05 4.322: Eliminate old stock and modify inventory control $2,500 $120 - - $2,500
TOTAL RECOMMENDED $56,799 $39,895 $29,079
552,250
kWh
$25,220 $2,500
TOTAL IMPLEMENTED $45,554 $36,520 $20,334
386,601
kWh
$25,220 -