ITAC Assessment: GT0631
ITAC logo
ITAC Assessment: GT0631
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Laminated Wood
NAICS
n/a
SIC 2493: Reconstituted Wood Products
Sales Range $10
M
to 50
M
# of Employees 55
Plant Area 65,000
ft2
Annual Production 50,000
thousand feet
Production Hrs. Annual 6,400
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $83,714 3,547,186
kWh
Electricity Demand $107,528 6,773
kW-mo/yr
Electricity Fees $9,320 -
Natural Gas $141,863 24,234
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $118,910 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,860

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings LPG Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.8114: Change rate schedules or other changes in utility service $57,241 $66,640 - - - - $(-5,020.0)
-
MMBtu
- - $62,261 -
02 2.8114: Change rate schedules or other changes in utility service $11,202 - - - - - - - - $11,202 -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,860 $300 $795
33,705
kWh
$963
-
kW-mo/yr
$102 - - - - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,350 $11,600 $1,435
60,668
kWh
$1,727
-
kW-mo/yr
$188 - - - - - -
05 2.1223: Install smaller boiler (increase high fire duty cycle) $2,485 - - - - $3,385
-
MMBtu
- - - $(-900.0) -
06 2.7314: Reduce ventilation air $11,330 $10,500 $8,360
148,007
kWh
- - $2,970
-
MMBtu
- - - - -
07 4.432: Cross-train personnel to avoid lost time $3,460 $1,000 $676
28,722
kWh
$818
-
kW-mo/yr
$91 - - - $1,875 - -
08 3.4114: Replace city water with recycled water via cooling tower $27,982 $2,100 $(-388.0)
(-7,034)
kWh
- - - - $28,870
-
Tgal
- - $(-500.0)
TOTAL RECOMMENDED $118,910 $92,140 $10,878
264,068
kWh
$3,508
-
kW-mo/yr
$381 $6,355
-
MMBtu
$(-5,020.0)
-
MMBtu
$28,870
-
Tgal
$1,875 $72,563 $(-500.0)
TOTAL IMPLEMENTED $1,860 $300 $795
33,705
kWh
$963
-
kW-mo/yr
$102 - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings LPG Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs